Conversion of coal-fired power plants to cogeneration and combined-cycle: thermal and economic effectiveness

Conversion of coal-fired power plants to cogeneration and combined-cycle: thermal and economic effectiveness

Bartnik, Ryszard
Buryn, Zbigniew

103,95 €(IVA inc.)

Conversion of Coal-Fired Power Plant to Cogeneration and Combined-Cycle presents the methodology, calculation procedures and tools used to support enterprise planning for adapting power stations to cogeneration and combined-cycle forms. The authors analyze the optimum selection of the structure of heat exchangers in a 370 MW power block, the structure of heat recovery steam generators and gas turbines. Conversion of Coal-Fired Power Plant to Cogeneration and Combined-Cycle also addresses the problems of converting existing power plants to dual-fuel gas-steam combined-cycle technologies coupled with parallel systems.Conversion of Coal-Fired Power Plant to Cogeneration and Combined-Cycle is aninformative monograph written for researchers, postgraduate students and policy makers in power engineering. Shows the problems affecting conversion of existing power plants to dual-fuel gas-steam combined-cycle technologies coupled in parallel systems. Contains a high proportion of figures to text, to aid thereader's understanding of the subject matter. Gives an analysis of the optimum selection of the structure of heat exchangers in a 370 MW power block, and optimum selection of gas turbines and structure of heat recovery steam generators INDICE: 1. Introduction. 2. Selection of Optimal Heating Structures for Modernization of Coal-Fired Power Stations to Cogeneration. 3. Mathematical Model of a Power Unit with Rated Capacity of 370 MW After Its Modernization to Cogeneration and Combined-Cycle. 4. Algorithm for the Calculation of an Optimum Structure of Heat Exchangers for the Modernization of a 370 MW Power Unit to Combined Heat and Power Cycle. 5. Testing Calculations of the Mathematical Modelof a Power Unit. 6. Thermodynamic Analysis of a Combined Heat and Power Unit Using Extractions A2, A3 and Crossoverpipe IP-LP for Heater Supply. 7. Economic Efficiency of a Power Unit Adapted to Cogeneration. 8. Technical and Economical Effectiveness of Modernization 370 MW Power Unit Repowered by Gas Turbine with Their Modernization to Cogeneration. 9. Technical and Economical Effectiveness of 370 MW Power Unit Repowered by Gas Turbine in Parallel System. 10. Summary and Final Conclusions.

  • ISBN: 978-0-85729-855-3
  • Editorial: Springer London
  • Encuadernacion: Cartoné
  • Páginas: 181
  • Fecha Publicación: 31/08/2011
  • Nº Volúmenes: 1
  • Idioma: Inglés