Integrated cost-schedule risk analysis

Integrated cost-schedule risk analysis

Hulett, David

135,82 €(IVA inc.)

INDICE: Contents: Why conduct risk analysis?; Cost risk analysis: the basics; What is Monte Carlo analysis and how does it apply?; Collecting high quality data on cost risk methods and challenges; The correlations between common project element costs; Using risk register risks to drive the cost risk analysis; Preparing for integrated cost and schedule risk analysis; Essentials of integrated cost and schedule risk analysis; Integrated analysis method and case study basic results; Integrated cost and schedule risk analysis advanced results; Summary of integrated cost and schedule analysis; Index.

  • ISBN: 978-0-566-09166-7
  • Editorial: Gower
  • Encuadernacion: Cartoné
  • Páginas: 200
  • Fecha Publicación: 01/06/2011
  • Nº Volúmenes: 1
  • Idioma: Inglés